Renovation of the Chillicothe Aquatic Center continued today (Monday), where the facility is being transformed into a water park, featuring a plunge pool, lazy river, enclosed flume water slide, an open raft water slide, diving boards, log roll, water spray features, a water play structure, wave generator, and other related items. 2 Point Construction is the contractor on the project. The city council planned to visit the site at 4 p.m., today, with a workshop meeting to follow at 5:30 p.m.