Area roadwork through Sept. 1

The Missouri Department of Transportation (MoDOT) has released a list of general highway maintenance and construction work MoDOT has planned in the Northwest Missouri region through Sept. 1. Continued flooding may cause schedule changes in some of the planned work. There may also be moving operations throughout the region such as pothole patching, striping, signal work, etc., in addition to the work mentioned below. All work is weather permitting and subject to change.

Carroll County

Route C – CLOSED until further notice at the Branch of Turkey Creek Bridge due to damage from flooding.

U.S. Route 65 – Bridge rehabilitation at the Wakenda Creek Bridge through late September. This includes a 15-foot width restriction.

Route YY – Pothole patching from Route J to Route M, Aug. 26 – 27

U.S. Route 65 – Bridge maintenance at the Shootman Creek and Mound Creek bridges, Aug. 26 – 29. Temporary traffic signals will be in place.

Route M – Pothole patching from U.S. Route 65 to the Chariton County line, Aug. 28 – 30

Chariton County

U.S. Route 24 – Bridge replacement project at the Mussel Fork River and Overflow Bridges west of Keytesville through early 2020. Traffic will be diverted over a one-lane, signalized bypass during the replacement of the Mussel Fork River Overflow Bridge. A 10-foot width restriction is in place.

U.S. Route 24 – Bridge replacement project at the Middle Fork Chariton River and Overflow bridges through early 2020. Traffic will be directed through the work zone with temporary traffic signals. A 10-foot width restriction is in place.

U.S. Route 24 – Milling and sealing from the city limits of Keytesville to the Randolph County line, Aug. 26

Route ZZ – Pothole patching from the Linn County line to the end state maintenance, Aug. 26

Route 11 – Milling and sealing from Route E to Newhall Road, Aug. 27

Route 5 – Milling and sealing from Forest Green to Route KK, Aug. 28 – 30

Clinton County

U.S. Route 169 – CLOSED for a bridge replacement project at the Castile Creek Bridge south of Gower through September. More info: https://www.modot.org/us-route-169-castile-creek-bridge

I-35 – Pothole patching from mile marker 48 (near Route 121) to mile marker 40 (near Route 116), Aug. 28 – 30

Daviess County

Route C – CLOSED for bridge rehabilitation at the I-35 overpass through September. More info: https://www.modot.org/clinton-and-daviess-county-bridge-deck-replacements-over-i-35

Route Z – Resurfacing project from U.S. Route 69 to U.S. Route 169 in King City (DeKalb County) Aug. 26 – 31

Route AA – CLOSED for a culvert replacement from Route T to Elmwood Avenue, Aug. 30, 7 a.m. to 3 p.m.

DeKalb County

Route Z – Resurfacing project from U.S. Route 169 to U.S. Route 69 (Daviess County), Aug. 26 – 31

Grundy County

Route Y – CLOSED for a culvert replacement from Route B to NE 100th Street, Aug. 27, 7:30 a.m. to 3 p.m.

Route N – CLOSED for a culvert replacement from NE 5th Street to NE 20th Street, Aug. 28, 7:30 a.m. to 3 p.m.

Holt County

Route T – CLOSED until further notice at Mill Bluff Road due to roadway damage.

I-29 – Resurfacing project from the Davis Creek Bridge (mile marker 84) to U.S. Route 59 (mile marker 67), Aug. 26 – 30

U.S. Route 159 – Resurfacing project from U.S. Route 59 to Route P near Fortescue and from the Missouri River to Route 111, Aug. 26 – 30

Route Y – CLOSED for a chip seal project, Aug. 29 – 30, 6:30 a.m. to 5 p.m. daily

Linn County

U.S. Route 36 – Bridge maintenance westbound on the Yellow Creek Overflow Bridge, Aug. 26 – 29

Route 11 – Bridge maintenance on the West Yellow Creek east of Brookfield, Aug. 26 – 30. This includes a 14-foot width restriction.

Route EE – Pothole patching from U.S. Route 36 to the end of state maintenance, Aug. 27 – 28

Route W – Pothole patching from U.S. Route 26 to the end of state maintenance, Aug. 29 – 30